South Hook LNG Terminal Gatehouse Wales

Control Room Design for a Security Gatehouse Facility.

"Our approach was improve visibility, access and flow within a security control room environment."

Liqui was appointed to lead the control room design for the redesign and extension of the security and control facility at the South Hook LNG Terminal, one of the UK’s most significant energy infrastructure sites.

Working alongside the appointed architect and civil engineering team, the project focused on transforming the existing gatehouse into a more capable security control and visitor reception environment while maintaining the stringent operational standards required for a Tier 1 gas terminal.

The building footprint was extended to the front, allowing the introduction of a full-height glazed façade that significantly improved visibility, natural light and the overall arrival experience. The redesigned entrance now places reception directly beside the main access point, creating a clearer and more welcoming interface for contractors, visitors and VIPs entering the terminal.

Security Control Room Design for Energy Infrastructure.

"Security control room design supporting continuous monitoring within a critical energy infrastructure control environment."

Internally, the space supports the operational requirements of a critical infrastructure control environment, where security, monitoring and access management systems must operate continuously and reliably. Control rooms act as the central hub where complex facilities are monitored and coordinated in real time, often integrating surveillance, alarms and operational systems into a single command environment.

Material choices were carefully considered to elevate the quality of the workspace while maintaining durability and compliance with the operational environment. Real oak veneer introduces warmth and tactility, balancing the technical nature of the facility with a refined architectural finish.

A subtle integration of the Qatari national colour references the terminal’s international ownership while remaining restrained and architectural rather than corporate in tone.

Secrity Gatehouse Design with Sustainable Materials and Technology.

"Energy control room design that integrates sustainable materials, digital systems and long term operational performance."

Sustainability was embedded throughout the interior specification. Finishes were selected for durability and environmental performance, including waterborne lacquers and low-VOC materials to improve internal air quality and reduce environmental impact.

Alongside the architectural improvements, new digital visitor management technology was integrated to streamline the sign-in process and strengthen compliance procedures across the secure site.

The result is a modern security and control facility that balances operational performance with architectural quality, demonstrating how even mission-critical infrastructure environments can benefit from thoughtful, human-centred design.

services provided.

Disciplines.

Interior.

Design, and full fit-out

design, and
fit-out

Exhibition.

design, build and install

Brand.

branding, web and marketing

Product.

furniture, lighting and bespoke

Contact us.

General enquiries
Interior enquiries
Product enquiries
General Enquiries:
 info@liquigroup.com

Interior Enquiries: interiors@liquigroup.com

Contracts Enquiries: contracts@liquigroup.com
London Office

+44(0)2031 304069

Thomas House
84 Eccleston Square, London
SW1V 1PX

Sussex studio & workshops

+44(0)1403 740086

The Campus
Unit 4B Thornhill Court, Billingshurst Road,
Coolham, West Sussex, RH13 8QN. UK